Kaagazaat

Fill in your details

Revised Building Plan Application

Answer what you can. The draft beside these boxes is rewritten as you go, so you can see exactly what each answer does to the document.

What you type stays in this browser. Nothing is sent anywhere until you choose to keep a copy — and closing this tab loses it.

Your answers

Nothing answered yet. There are 39 questions on this form.

Still to answer

34 answers are still to come.

Nothing is amiss in what you have written. The document is simply not finished, and the draft marks each gap where an answer will go.

  1. The applicant
  2. The site
  3. Architect and structural engineer
  4. The revision
  5. Compliance and services
  6. Drawings, fee and declaration

Step 1 of 6

The applicant

For example: Aarav Sharma

What is the applicant's correspondence address?Needed
In what capacity is the application made?Needed
More details — you may leave these

A number somebody can be reached on. Ten digits is the usual Indian form, and a country code in front of it is fine if you want it there.

For example: 98765 43210

An email address somebody actually reads. Notices under a document like this can be sent to it, so a working one matters more than a tidy one.

For example: aarav@example.com

Read the whole draft

Clearing empties every box on this form, and there is no way back to what was in them.

The live draft

The draft, as it stands

This is the whole document, not a sample of it. It is rewritten every time you change an answer.

A long blank line — __________ — stands wherever an answer has not been given. It is left that visible on purpose, so an unfinished document cannot be mistaken for a finished one.

No answer has been given, so every place a detail belongs is standing blank. The shape of the document is worth reading even now.

REVISED BUILDING PLAN APPLICATION

Application date: __________

Applicant: __________, __________, capacity __________..

Property: __________ (__________), __________, site area __________ sq m. Title/allotment: __________. Jurisdiction __________; authority __________.

Original sanction: __________.

  1. REVISION

Trigger: __________. Revision summary: __________. Construction status: __________.

Original/current plan metrics supplied for review: coverage __________ sq m, built-up __________ sq m, floors __________, height __________ m, basement __________. Revised coverage: __________ sq m. Revised built-up area: __________ sq m.

  1. COMPLIANCE

Zoning: __________. Parking: __________. Deviation classification: __________.

  1. TECHNICAL COORDINATION

Structural: __________. Fire: __________. Public health: __________. Energy/environment: __________.

  1. PROFESSIONALS

..

  1. SUBMISSION

Revised drawing schedule: __________. Fee status: __________.

  1. REQUEST

Please approve only those revisions permissible under the applicable rules. Work affected by the revision will not be treated as sanctioned until the competent authority approves it.

LEGAL BASIS

In Chandigarh building plans are filed on the Online Building Plan Approval System at obps.chandigarhsmartcity.in. Under the Estate Officer's Public Notice effective 10 February 2023, which followed the Supreme Court's judgment of 10 January 2023, the Estate Office entertains building plans and revised building plans for a residential property with more than one owner only where all the co-owners belong to the same family. In Punjab, on a site allotted by a development authority under the Punjab Regional and Town Planning and Development Act, 1995, a sanction of building plans is given only to the allottee on the authority's file, and the completion certificate is issued under rule 14 and the occupation certificate under rule 23 of the Punjab Urban Planning and Development Building Rules, 2021, by the municipal corporation, council or development authority concerned.

PERSONAL DATA NOTICE

This notice is given under the Digital Personal Data Protection Act, 2023.

Personal data in this document is collected only to prepare, submit and administer the revised building-plan application, communicate about that purpose, verify expressly supplied property and approval information, and retain an evidentiary application record.

The record will be held by __________ and may be shared only with the applicant, owner, architect, engineer, licensed professional, project consultant, lender, contractor, competent planning/building/fire/environment/water authority, or other person directly involved in the stated approval.

If the application is withdrawn, refused or does not proceed, personal data will be retained for 90 days and then erased. If it proceeds, the record will be retained for the approval/project plus 12 months, except where a statute or authority record-retention rule requires a longer named period.

A person named here may withdraw consent for future consent-based processing, request correction or erasure when the stated purpose has ended, or raise a grievance by writing to __________. The record-holder should acknowledge and respond within 30 days.

Data minimisation: this document does not collect a full Aadhaar number, an Aadhaar-card copy, a password or unrelated financial credentials, and none should be written into it. Collect identity and professional-registration details only where the receiving authority actually requires them.

Personal-data instruction: __________.

Record-holder: __________

SIGNATURE

Applicant: __________

The rest stays out of view until every answer is in.

KAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINAL

REVISED BUILDING PLAN APPLICATION

Application date: __________

Applicant: __________, __________, capacity __________..

Property: __________ (__________), __________, site area __________ sq m. Title/allotment: __________. Jurisdiction __________; authority __________.

Original sanction: __________.

  1. REVISION

Trigger: __________. Revision summary: __________. Construction status: __________.

Original/current plan metrics supplied for review: coverage __________ sq m, built-up __________ sq m, floors __________, height __________ m, basement __________. Revised coverage: __________ sq m. Revised built-up area: __________ sq m.

  1. COMPLIANCE

Zoning: __________. Parking: __________. Deviation classification: __________.

  1. TECHNICAL COORDINATION

Structural: __________. Fire: __________. Public health: __________. Energy/environment: __________.

  1. PROFESSIONALS

..

  1. SUBMISSION

Revised drawing schedule: __________. Fee status: __________.

  1. REQUEST

Please approve only those revisions permissible under the applicable rules. Work affected by the revision will not be treated as sanctioned until the competent authority approves it.

LEGAL BASIS

In Chandigarh building plans are filed on the Online Building Plan Approval System at obps.chandigarhsmartcity.in. Under the Estate Officer's Public Notice effective 10 February 2023, which followed the Supreme Court's judgment of 10 January 2023, the Estate Office entertains building plans and revised building plans for a residential property with more than one owner only where all the co-owners belong to the same family. In Punjab, on a site allotted by a development authority under the Punjab Regional and Town Planning and Development Act, 1995, a sanction of building plans is given only to the allottee on the authority's file, and the completion certificate is issued under rule 14 and the occupation certificate under rule 23 of the Punjab Urban Planning and Development Building Rules, 2021, by the municipal corporation, council or development authority concerned.

PERSONAL DATA NOTICE

This notice is given under the Digital Personal Data Protection Act, 2023.

Personal data in this document is collected only to prepare, submit and administer the revised building-plan application, communicate about that purpose, verify expressly supplied property and approval information, and retain an evidentiary application record.

The record will be held by __________ and may be shared only with the applicant, owner, architect, engineer, licensed professional, project consultant, lender, contractor, competent planning/building/fire/environment/water authority, or other person directly involved in the stated approval.

If the application is withdrawn, refused or does not proceed, personal data will be retained for 90 days and then erased. If it proceeds, the record will be retained for the approval/project plus 12 months, except where a statute or authority record-retention rule requires a longer named period.

A person named here may withdraw consent for future consent-based processing, request correction or erasure when the stated purpose has ended, or raise a grievance by writing to __________. The record-holder should acknowledge and respond within 30 days.

Data minimisation: this document does not collect a full Aadhaar number, an Aadhaar-card copy, a password or unrelated financial credentials, and none should be written into it. Collect identity and professional-registration details only where the receiving authority actually requires them.

Personal-data instruction: __________.

Record-holder: __________

SIGNATURE

Applicant: __________

Reading costs nothing. Keeping a copy needs an account.

The opening of the draft is on this page as you answer it. Once every answer is in, the button below opens the whole draft, watermarked — still without an account. Printing it, or keeping a clean copy, is where an account is asked for. That is the whole arrangement.

A kept copy has to belong to somebody, and that is the reason for the account. There is nothing further to it.

Continue to download

Carry on reading without one

Back to what this document is