Kaagazaat

Fill in your details

Landlord's Scope of Work Annexure (Bare Shell / Warm Shell)

Answer what you can. The draft beside these boxes is rewritten as you go, so you can see exactly what each answer does to the document.

What you type stays in this browser. Moving to a new step asks this site to draw it, but nothing is kept anywhere until you choose to keep a copy — and closing this tab loses it.

Your answers

Nothing answered yet. There are 6 questions on this form.

Still to answer

6 answers are still to come.

Nothing is amiss in what you have written. The document is simply not finished, and the draft marks each gap where an answer will go.

  1. The landlord, the tenant and the lease
  2. What condition the premises are handed over in
  3. Services and finishes the landlord provides
  4. Handover date, delay and snags

Step 1 of 4

The landlord, the tenant and the lease

For example: Sethi Estates Private Limited

Landlord's addressNeeded

For example: Northline Analytics Private Limited

Tenant's registered or business addressNeeded
The premises (unit, floor, building and address)Needed

For example: Commercial Lease Deed dated 1 April 2026

Read the whole draft

Clearing empties every box on this form, and there is no way back to what was in them.

The live draft

The draft, as it stands

This is the document as far as you have reached, not the whole of it yet — the rest appears as you answer more questions. It is rewritten every time you change an answer.

A long blank line — __________ — stands wherever an answer has not been given. It is left that visible on purpose, so an unfinished document cannot be mistaken for a finished one.

No answer has been given, so every place a detail belongs is standing blank. The shape of the document is worth reading even now.

LANDLORD'S SCOPE OF WORK ANNEXURE

  1. 1. STANDARD OF HANDOVER

1.2 The works the Landlord carries out under this Annexure are called the "Landlord's Works". Everything the Tenant does inside the Premises after possession is the Tenant's fit-out, which is outside this Annexure and is the Tenant's cost unless the Lease says otherwise.

  1. 2. WHAT THE LANDLORD PROVIDES

2.7 The Landlord shall carry out the Landlord's Works in a workmanlike manner, with sound materials, in line with the sanctioned plans and the requirements of the authority that governs the building, and shall keep the Tenant informed of progress when the Tenant asks.

4.4 A delay caused by the Tenant, or by something the Tenant was asked to do and did not do, does not count against the Landlord for the purpose of clause 4.3.

  1. 5. HANDOVER AND SNAGGING

5.1 On handover the Parties shall walk through the Premises together and the Landlord shall give the Tenant written notice that the Landlord's Works are complete. A short signed note of the walk-through, with photographs, is enough.

5.3 Handing over possession, and the Tenant starting its fit-out, does not take away the Tenant's right to the defects list in clause 5.2.

  1. 6. GENERAL

6.1 This Annexure is part of the Lease. If it conflicts with the Lease on the Landlord's Works, this Annexure governs for that purpose and the Lease governs on everything else.

6.2 Changes to the Landlord's Works need the written agreement of both Parties.

FOR THE LANDLORD
__________
Signature: ______________________________

FOR THE TENANT
__________
Signature: ______________________________

The rest stays out of view until every answer is in.

KAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINAL

Reading costs nothing. Keeping a copy needs an account.

The opening of the draft is on this page as you answer it. Once every answer is in, the button below opens the whole draft, watermarked — still without an account. Printing it, or keeping a clean copy, is where an account is asked for. That is the whole arrangement.

A kept copy has to belong to somebody, and that is the reason for the account. There is nothing further to it.

Continue to download

Carry on reading without one

Back to what this document is

We've updated our Terms

Please read the updated documents below and accept them once to keep taking documents away and buying kits. Browsing, filling in and previewing a document are not affected.