To,
Décor Craft Interiors
SCO 212, Sector 34-A, Chandigarh
From:
Anmol Kaur
Flat No. 604, Sector 82, Mohali
Date: 2 April 2026
Reference: Interior Work Contract dated 12 March 2026, for work at Flat No. 604, Sector 82, Mohali, handed over on 1 April 2026, carrying a defect liability/warranty period of 12 months from handover.
Dear Sir/Madam,
I/We write to place on record the following defects in the work carried out by you, first noticed/reported on 2 April 2026, which fall within the defect liability/warranty period referred to above:
- 1. Water seepage below the kitchen sink, first noticed 3 June 2026.
- 2. Two wardrobe shutters in the master bedroom not closing flush.
- 3. Cracks in the false ceiling in the living room, appearing within two months of handover.
This has already been raised informally: Raised on a phone call with the site supervisor on 5 June 2026, and again by WhatsApp message on 10 June 2026, with no response
You are called upon to depute your workmen to inspect and rectify the above defects, at your own cost, within 15 days of the date of this notice.
I/we draw your attention to the retention/security amount of ₹80,000 (Rupees Eighty Thousand only) held under the original contract, which remains available to meet the cost of rectification if you do not attend to it within the time given.
Please note that if the defects listed above are not rectified within the time given, I/we will get the defects rectified through another agency and deduct the cost from the retention amount held, or recover it from the Contractor, without further reference to you.
This notice is sent without prejudice to any other right available under the original contract or in law.
Sent by: Registered post with acknowledgement due, and by email to the Contractor’s registered email address
Yours faithfully,
_________________
Anmol Kaur
Mohali, 2 April 2026