APPLICATION FOR EXTENSION OF TIME UNDER SECTION 118 PERMISSION
To,
The Collector,
__________, Himachal Pradesh.
Subject: Application for more time to use land bought under the permission granted under section 118 of the Himachal Pradesh Tenancy and Land Reforms Act, 1972.
Respected Sir/Madam,
1. The applicant
1.1 I, __________, __________, resident of __________, respectfully state as follows.
2. The permission
2.1 I bought land in __________ district under permission given by the order __________ under section 118 of the Himachal Pradesh Tenancy and Land Reforms Act, 1972. The land is:
__________
2.2 The permission was given for __________.
2.3 The time given in the order is: __________.
3. What has been done
3.2 What has been done so far is:
4. Why more time is needed
4.1 The work could not be finished in the time allowed for these reasons:
4.2 I have not put the land to any use other than the use permitted, and I have not sold, leased or otherwise parted with it.
5. Papers enclosed
5.1 I enclose:
6. Prayer
Signature: ______________________________
__________
Verification
I, __________, verify that the statements in paragraphs 1 to 5 are true and correct to my knowledge and belief, that nothing material is concealed, and that no part of this application is false.
Signature: ______________________________
__________