Contractor's Safety and Insurance Undertaking

Answer what you can. The draft beside these boxes is rewritten as you go, so you can see exactly what each answer does to the document.

What you type stays in this browser. Moving to a new step asks this site to draw it, but nothing is kept anywhere until you choose to keep a copy — and closing this tab loses it.

Your answers

Nothing answered yet. There are 4 questions on this form.

Still to answer

4 answers are still to come.

Nothing is amiss in what you have written. The document is simply not finished, and the draft marks each gap where an answer will go.

  1. The Owner and the Contractor
  2. Worker safety
  3. Insurance
  4. Signing

Step 1 of 4

The Owner and the Contractor

For example: Gurpreet Singh

Owner's addressNeeded

For example: Balwinder Singh, Sai Construction Co.

Contractor's address or officeNeeded
Read the whole draft

Clearing empties every box on this form, and there is no way back to what was in them.

The live draft

The draft, as it stands

This is the document as far as you have reached, not the whole of it yet — the rest appears as you answer more questions. It is rewritten every time you change an answer.

A long blank line — __________ — stands wherever an answer has not been given. It is left that visible on purpose, so an unfinished document cannot be mistaken for a finished one.

No answer has been given, so every place a detail belongs is standing blank. The shape of the document is worth reading even now.

CONTRACTOR'S SAFETY AND INSURANCE UNDERTAKING

BY

__________, of __________ ("the Contractor", which expression shall include its partners, legal representatives and permitted assigns),

IN FAVOUR OF

__________, resident of __________ ("the Owner", which expression shall include the Owner's heirs and legal representatives).

1. THE WORK

2. SAFETY OF WORKERS AND OTHERS

2.1 The Contractor is solely responsible for the safety of every person it engages at the Site, whether directly or through a sub-contractor or thekedar, and of every visitor to the work area.

2.4 The Contractor shall stop any work that is unsafe, and shall not leave an open excavation, a shaft or an unguarded edge without protection.

3. INSURANCE

4. INJURY, DEATH AND DAMAGE

4.1 If any worker or other person engaged by the Contractor is injured, falls ill because of the work, or dies at or in connection with the Site, the Contractor alone shall be responsible for their medical care, for any compensation, wages, dues or other sums payable under the law applicable to them, and for all related costs, whether or not insured.

4.3 The Contractor is also responsible for any damage to the property of the Owner, a neighbour or the public caused by its workers or the Work, and shall make it good at its own cost.

5. INDEMNITY

5.1 The Contractor shall keep the Owner fully indemnified against any claim, demand, proceeding, loss, cost or expense, including reasonable legal fees, arising from any injury, death, illness or damage described above, or from the Contractor's failure to keep the insurance or safety arrangements stated in this Undertaking.

5.2 If a claim is made against the Owner, the Contractor shall at once take it over and, if required, join in defending it. If the Owner has to pay any sum, the Contractor shall repay it on demand, and the Owner may set it off against any amount due to the Contractor under the Contract.

6. GENERAL

6.1 This Undertaking is in addition to the Contract and does not reduce any obligation of the Contractor under it. It does not take away any right a worker has under the law.

CONTRACTOR

_________________
__________

ACCEPTED by the Owner:

OWNER

_________________
__________

WITNESSES

  1. 1. _________________
  1. 2. _________________

The rest stays out of view until every answer is in.

KAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINAL

Reading costs nothing. Keeping a copy needs an account.

The opening of the draft is on this page as you answer it. Once every answer is in, the button below opens the whole draft, watermarked — still without an account. Printing it, or keeping a clean copy, is where an account is asked for. That is the whole arrangement.

A kept copy has to belong to somebody, and that is the reason for the account. There is nothing further to it.