Kaagazaat

Fill in your details

Solar Rooftop Installation Contract

Answer what you can. The draft beside these boxes is rewritten as you go, so you can see exactly what each answer does to the document.

What you type stays in this browser. Moving to a new step asks this site to draw it, but nothing is kept anywhere until you choose to keep a copy — and closing this tab loses it.

Your answers

Nothing answered yet. There are 5 questions on this form.

Still to answer

4 answers are still to come.

Nothing is amiss in what you have written. The document is simply not finished, and the draft marks each gap where an answer will go.

  1. The Owner and the Contractor
  2. The plant and the paperwork
  3. Price and payment
  4. Time, performance and warranty
  5. Signing

Step 1 of 5

The Owner and the Contractor

For example: Ramandeep Singh

Owner's addressNeeded

For example: Suryakiran Energy Pvt Ltd

Installer's address or officeNeeded
More details — you may leave these

For example: 03ABCDE1234F1Z5

Read the whole draft

Clearing empties every box on this form, and there is no way back to what was in them.

The live draft

The draft, as it stands

This is the document as far as you have reached, not the whole of it yet — the rest appears as you answer more questions. It is rewritten every time you change an answer.

A long blank line — __________ — stands wherever an answer has not been given. It is left that visible on purpose, so an unfinished document cannot be mistaken for a finished one.

No answer has been given, so every place a detail belongs is standing blank. The shape of the document is worth reading even now.

SOLAR ROOFTOP INSTALLATION CONTRACT

BETWEEN

__________, resident of __________ ("the Owner", which expression shall include the Owner's heirs, legal representatives and assigns), of the ONE PART;

AND

__________, of __________ ("the Contractor", which expression shall include the Contractor's partners, legal representatives and permitted assigns), of the OTHER PART.

The Owner and the Contractor are together "the Parties".

1. THE SITE AND THE PLANT

1.2 The Owner confirms that the Owner has the right to use the roof for the Plant and shall give the Contractor safe access to it. If the roof belongs to a society, a co-owned building or an allottee building, the Owner shall obtain any consent needed from the other owners or the society before work starts.

2. COMPONENTS AND STANDARDS

2.2 All components shall be new, of the make and model named above, and shall meet the technical, safety and quality requirements that apply to such a plant under law and under the rules of the distribution utility. The Contractor shall give the Owner the datasheets and warranty cards for the principal components.

2.3 The Contractor shall not substitute a component without the Owner's written consent, and any substitute shall be of equal or better specification at no extra cost.

3. NET-METERING AND GRID PAPERWORK

3.3 The grant of net-metering or grid connection is decided by the distribution utility and not by the Contractor. The Contractor shall not be liable for the utility's delay or refusal where the Contractor has filed correct and complete documents and followed the utility's process, but shall correct any technical deficiency in the Plant that the utility points out.

4. CONTRACT VALUE AND PAYMENT

5. TIME FOR COMPLETION

6. PERFORMANCE

7. WARRANTY AND DEFECTS

8. SAFETY AND INSURANCE

8.2 The Contractor is solely responsible for the safety of its workmen, including work at height on the roof, and for compliance with applicable labour law in respect of their wages, provident fund, employees' state insurance and any welfare cess, and shall keep the Owner indemnified against any claim arising from the Contractor's failure to do so.

9. TERMINATION

9.1 Either Party may terminate this Contract on a material breach by the other that remains uncured for fifteen days after written notice, without prejudice to any amount already due.

10. DISPUTE RESOLUTION

11. GENERAL

11.1 This Contract, together with any drawing, specification or schedule attached, is the entire agreement between the Parties on the Work and supersedes any earlier discussion.

OWNER

_________________
__________

CONTRACTOR

_________________
__________

WITNESSES

  1. 1. _________________
  1. 2. _________________

The rest stays out of view until every answer is in.

KAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINAL

Reading costs nothing. Keeping a copy needs an account.

The opening of the draft is on this page as you answer it. Once every answer is in, the button below opens the whole draft, watermarked — still without an account. Printing it, or keeping a clean copy, is where an account is asked for. That is the whole arrangement.

A kept copy has to belong to somebody, and that is the reason for the account. There is nothing further to it.

Continue to download

Carry on reading without one

Back to what this document is

We've updated our Terms

Please read the updated documents below and accept them once to keep taking documents away and buying kits. Browsing, filling in and previewing a document are not affected.