Kaagazaat

Solar Rooftop Installation Contract

At a glance

Price
Free, always.
Stamp duty
Chargeable as an agreement, not a conveyance — this document transfers no interest in the Site.
Registration
Not compulsorily registrable under section 17 of the Registration Act, 1908 — it creates no interest in immovable property.
Witnesses
Not legally required for a contract of this kind, but two witnesses are provided for below, given the value that typically passes under it and how often the facts of what was actually agreed become disputed only once work has started.

Free

Free, always.

Free: up to 5 documents a day.

Guided questions, full draft on screen, download in Word.

See all prices

Also called

  • solar installation agreement
  • rooftop solar EPC contract
  • solar panel installation contract
  • solar power plant installation agreement
  • net metering installation contract
  • ghar ki chhat par solar
  • ਸੋਲਰ ਇੰਸਟਾਲੇਸ਼ਨ ਇਕਰਾਰਨਾਮਾ
  • सोलर पैनल लगाने का अनुबंध

When you need it

You are paying an installer to put a solar power plant on the roof of your own house or building in Punjab or Chandigarh. This records the plant size, the components and brands, who handles the net-metering or grid-connection paperwork, the payment stages, the performance statement and the warranties.

Read more

Not for letting your roof to a solar company that owns the plant — use the Solar Rooftop Lease. Not for the power purchase agreement itself.

Whether you can fill this in here

You can fill this in here

You can fill this one in on this site, and read the whole draft on screen before you decide anything about it. It is a carefully drafted template; it is not advice about your own facts.

Fill this one in
See stamp duty, registration and witnesses

What follows is written for Punjab and Chandigarh. It states the position there rather than describing how it varies, so the amounts below are the ones that apply — worth confirming at the sub-registrar’s office, because rates change. If the property is anywhere else in India, none of this is yours.

Stamp duty

Chargeable as an agreement, not a conveyance — this document transfers no interest in the Site. PUNJAB: Article 5, Schedule I-A to the Indian Stamp Act, 1899 as applicable in Punjab; the residuary rate under Article 5(c) where no more specific sub-clause fits. Confirm the current figure with the Sub-Registrar or against the Department of Revenue, Rehabilitation and Disaster Management's published table at revenue.punjab.gov.in before the stamp is bought. CHANDIGARH: the equivalent agreement article under the Chandigarh Administration's Rates of Stamp Duty & Registration Fees table at revenue.chd.gov.in; confirm the current figure at the Sub-Registrar's office, 30 Bays Building. Buy the e-stamp before signing.

Registration

Not compulsorily registrable under section 17 of the Registration Act, 1908 — it creates no interest in immovable property. Optional registration under section 18 is available but rarely used for a document of this kind.

Notarisation

Not legally required. Notarising is sometimes done to fix the date the document was signed, which can matter if the timeline is later disputed.

Witnesses

Not legally required for a contract of this kind, but two witnesses are provided for below, given the value that typically passes under it and how often the facts of what was actually agreed become disputed only once work has started.

Request Stamp Paper

Sample preview — placeholder answers, not your data

SOLAR ROOFTOP INSTALLATION CONTRACT

This Contract is made at Mohali on 2 April 2026

BETWEEN

Ramandeep Singh, resident of House No. 214, Sector 70, Mohali ("the Owner", which expression shall include the Owner's heirs, legal representatives and assigns), of the ONE PART;

AND

Suryakiran Energy Pvt Ltd, of SCO 44, Phase 3B2, Mohali, bearing registration/GST number 03ABCDE1234F1Z5 ("the Contractor", which expression shall include the Contractor's partners, legal representatives and permitted assigns), of the OTHER PART.

The Owner and the Contractor are together "the Parties".

1. THE SITE AND THE PLANT

1.1 The Contractor agrees to design, supply, install and commission a rooftop solar power plant of 5 kW ("the Plant") on the building at House No. 214, Sector 70, Mohali ("the Site"), a grid-connected with net-metering system, and the Owner agrees to pay for it ("the Work").

1.2 The Owner confirms that the Owner has the right to use the roof for the Plant and shall give the Contractor safe access to it. If the roof belongs to a society, a co-owned building or an allottee building, the Owner shall obtain any consent needed from the other owners or the society before work starts.

2. COMPONENTS AND STANDARDS

2.1 Components to be supplied: 10 panels of 540 Wp each, one 5 kW inverter, galvanised mounting structure, DC and AC cables, protection devices and earthing, generation meter

2.2 All components shall be new, of the make and model named above, and shall meet the technical, safety and quality requirements that apply to such a plant under law and under the rules of the distribution utility. The Contractor shall give the Owner the datasheets and warranty cards for the principal components.

2.3 The Contractor shall not substitute a component without the Owner's written consent, and any substitute shall be of equal or better specification at no extra cost.

3. NET-METERING AND GRID PAPERWORK

3.1 The Contractor shall prepare and file the net-metering or grid-connection application and documents with the distribution utility on the Owner’s behalf and follow it up until the meter is installed.

3.2 Fees and charges: Utility fees and meter charges to be paid by the Owner directly against receipts; the Contractor’s paperwork service is included in the contract value

3.3 The grant of net-metering or grid connection is decided by the distribution utility and not by the Contractor. The Contractor shall not be liable for the utility's delay or refusal where the Contractor has filed correct and complete documents and followed the utility's process, but shall correct any technical deficiency in the Plant that the utility points out.

3.4 Subsidy or incentive: X

4. CONTRACT VALUE AND PAYMENT

4.1 The total contract value is ₹3,25,000 (Rupees Three Lakh Twenty Five Thousand only), exclusive of goods and services tax and any other tax or cess payable in addition, unless stated otherwise.

Questions about this document

Does the Solar Rooftop Installation Contract need stamp paper or stamp duty in Punjab and Chandigarh?

Chargeable as an agreement, not a conveyance — this document transfers no interest in the Site.

See the full position on stamp duty, registration and witnesses
Does the Solar Rooftop Installation Contract need registration in Punjab and Chandigarh?

Not compulsorily registrable under section 17 of the Registration Act, 1908 — it creates no interest in immovable property.

See the full position on stamp duty, registration and witnesses
What does the Solar Rooftop Installation Contract cost on Kaagazaat?

Free, always.

Does the Solar Rooftop Installation Contract need witnesses?

Not legally required for a contract of this kind, but two witnesses are provided for below, given the value that typically passes under it and how often the facts of what was actually agreed become disputed only once work has started.

See the full position on stamp duty, registration and witnesses

Often needed with this document

Back to House Construction & Renovation

We've updated our Terms

Please read the updated documents below and accept them once to keep taking documents away and buying kits. Browsing, filling in and previewing a document are not affected.