Kaagazaat

Fill in your details

Stop-Work or Termination Notice to a Contractor

Answer what you can. The draft beside these boxes is rewritten as you go, so you can see exactly what each answer does to the document.

What you type stays in this browser. Moving to a new step asks this site to draw it, but nothing is kept anywhere until you choose to keep a copy — and closing this tab loses it.

Your answers

Nothing answered yet. There are 4 questions on this form.

Still to answer

4 answers are still to come.

Nothing is amiss in what you have written. The document is simply not finished, and the draft marks each gap where an answer will go.

  1. The Owner and the Contractor
  2. The reason
  3. What you require
  4. The work done so far
  5. Sending the notice

Step 1 of 5

The Owner and the Contractor

For example: Anmol Kaur

Owner's addressNeeded

For example: Décor Craft Interiors

Contractor's address or officeNeeded
Read the whole draft

Clearing empties every box on this form, and there is no way back to what was in them.

The live draft

The draft, as it stands

This is the document as far as you have reached, not the whole of it yet — the rest appears as you answer more questions. It is rewritten every time you change an answer.

A long blank line — __________ — stands wherever an answer has not been given. It is left that visible on purpose, so an unfinished document cannot be mistaken for a finished one.

No answer has been given, so every place a detail belongs is standing blank. The shape of the document is worth reading even now.

To,
__________
__________

From:
__________
__________

NOTICE TO STOP WORK / NOTICE OF BREACH AND TERMINATION

Dear Sir/Madam,

I/We write to place on record the following breaches by you of the contract referred to above:

WHAT YOU ARE REQUIRED TO DO

You are also required to keep the Site secure, to protect the work done and the materials on it, and to hand over to me/us on request all keys, drawings and any materials or items belonging to me/us. Your tools, equipment and surplus materials may be removed only after a joint inventory is made.

THE WORK DONE SO FAR

Nothing in this notice is a waiver of any right of mine/ours under the contract or in law, including the right to recover any loss caused by the breaches above. Any step taken by me/us after this notice, such as securing the Site or measuring the work, is without prejudice to those rights.

Yours faithfully,

The rest stays out of view until every answer is in.

KAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINAL

Reading costs nothing. Keeping a copy needs an account.

The opening of the draft is on this page as you answer it. Once every answer is in, the button below opens the whole draft, watermarked — still without an account. Printing it, or keeping a clean copy, is where an account is asked for. That is the whole arrangement.

A kept copy has to belong to somebody, and that is the reason for the account. There is nothing further to it.