Trade Work Order (Electrical / Plumbing / Tile / Paint)

Answer what you can. The draft beside these boxes is rewritten as you go, so you can see exactly what each answer does to the document.

What you type stays in this browser. Moving to a new step asks this site to draw it, but nothing is kept anywhere until you choose to keep a copy — and closing this tab loses it.

Your answers

Nothing answered yet. There are 5 questions on this form.

Still to answer

4 answers are still to come.

Nothing is amiss in what you have written. The document is simply not finished, and the draft marks each gap where an answer will go.

  1. The Owner and the Contractor
  2. The trade, the site and the work
  3. Rate and payment
  4. Time, defects and safety
  5. Signing

Step 1 of 5

The Owner and the Contractor

For example: Gurpreet Singh

Owner's addressNeeded

For example: Harjit Electricals

Contractor's address or officeNeeded
More details — you may leave these

For example: GST 03ABCDE1234F1Z5

Read the whole draft

Clearing empties every box on this form, and there is no way back to what was in them.

The live draft

The draft, as it stands

This is the document as far as you have reached, not the whole of it yet — the rest appears as you answer more questions. It is rewritten every time you change an answer.

A long blank line — __________ — stands wherever an answer has not been given. It is left that visible on purpose, so an unfinished document cannot be mistaken for a finished one.

No answer has been given, so every place a detail belongs is standing blank. The shape of the document is worth reading even now.

BETWEEN

__________, resident of __________ ("the Owner"), of the ONE PART;

AND

__________, of __________ ("the Contractor", which expression shall include its partners, legal representatives and permitted assigns), of the OTHER PART.

1. THE WORK

1.5 Materials shall be of the make, grade and specification agreed in writing between the Parties. The Owner or the Owner's representative may inspect materials and workmanship at any reasonable time before they are fixed, laid or applied.

1.6 The Contractor shall carry out the Work with competent workers and shall hold any licence, registration or permission that applies to this trade for work of this kind. The finished Work shall be tested or inspected in the Owner's presence before handover.

2. RATE AND PAYMENT

3. TIME FOR COMPLETION

4. DEFECT LIABILITY

5. INSURANCE, SAFETY AND LABOUR

5.2 The Contractor is solely responsible for the safety of its workmen and for compliance with applicable labour law in respect of their wages, provident fund, employees' state insurance and any welfare cess, and shall keep the Owner indemnified against any claim arising from the Contractor's failure to do so.

6. TERMINATION

6.1 Either Party may terminate this Work Order on a material breach by the other that remains uncured for fifteen days after written notice, without prejudice to any amount already due.

7. DISPUTE RESOLUTION

8. GENERAL

8.1 This Work Order is the entire agreement between the Parties on the Work. Any extra or changed work, or any change of time or price, shall be valid only if recorded in writing and signed by both Parties.

OWNER

_________________
__________

CONTRACTOR

_________________
__________

WITNESSES

  1. 1. _________________
  1. 2. _________________

The rest stays out of view until every answer is in.

KAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINAL

Reading costs nothing. Keeping a copy needs an account.

The opening of the draft is on this page as you answer it. Once every answer is in, the button below opens the whole draft, watermarked — still without an account. Printing it, or keeping a clean copy, is where an account is asked for. That is the whole arrangement.

A kept copy has to belong to somebody, and that is the reason for the account. There is nothing further to it.

Continue to download

Carry on reading without one

Back to what this document is

We've updated our Terms

Please read the updated documents below and accept them once to keep taking documents away and buying kits. Browsing, filling in and previewing a document are not affected.