This Work Order is made at Chandigarh on 2 April 2026
BETWEEN
Gurpreet Singh, resident of House No. 412, Sector 44-A, Chandigarh ("the Owner"), of the ONE PART;
AND
Harjit Electricals, of Shop 18, Phase 5, Mohali, bearing licence/registration/ID number GST 03ABCDE1234F1Z5 ("the Contractor", which expression shall include its partners, legal representatives and permitted assigns), of the OTHER PART.
1.1 The Owner engages the Contractor to carry out Electrical work at House No. 412, Sector 44-A, Chandigarh ("the Site"), as described below ("the Work").
1.2 Scope of work: Rewiring of the ground floor: 14 light points, 10 plug points, 4 fan points, new distribution board and earthing; old wiring to be removed; wall chasing and making good included.
1.3 Approximate quantity or area: About 1,100 sq ft of floor tiling
1.4 The Contractor supplies all materials
Specifically: Owner supplies tiles and fixtures; Contractor supplies adhesive, grout, spacers and labour
1.5 Materials shall be of the make, grade and specification agreed in writing between the Parties. The Owner or the Owner's representative may inspect materials and workmanship at any reasonable time before they are fixed, laid or applied.
1.6 The Contractor shall carry out the Work with competent workers and shall hold any licence, registration or permission that applies to this trade for work of this kind. The finished Work shall be tested or inspected in the Owner's presence before handover.
2.1 The Work is priced on a fixed lump-sum price for the trade work: Rs 95 per sq ft laid, labour and adhesive included.
2.2 The total contract value is ₹1,05,000 (Rupees One Lakh Five Thousand only), exclusive of goods and services tax and any other tax or cess payable in addition, unless stated otherwise. Where the Work is priced by measurement, payment is for the quantity actually measured jointly and accepted by both Parties.
2.3 The Owner shall pay the Contractor an advance of ₹20,000 (Rupees Twenty Thousand only) on signing, adjustable against the final bill.
2.4 Payment schedule: Advance on signing; 50% on completion of half the work as jointly measured; balance on completion and testing, after retention
2.5 The Owner shall retain 5% of each payment as security/retention, released on expiry of the defect liability period under clause 4.
3.1 The Work shall commence on 1 April 2026 and be completed on or before 2 April 2026, subject to force majeure and any delay directly caused by the Owner.
3.2 Rs 1,000 per day of delay beyond the completion date, capped at 5% of the contract value
4.1 The Contractor shall, at its own cost, make good any defect in workmanship or materials supplied by it appearing within 12 months of the date of completion, other than a defect caused by misuse or by work carried out by a third party after handover.