Kaagazaat

Fill in your details

Variation Order and Extension of Time

Answer what you can. The draft beside these boxes is rewritten as you go, so you can see exactly what each answer does to the document.

What you type stays in this browser. Moving to a new step asks this site to draw it, but nothing is kept anywhere until you choose to keep a copy — and closing this tab loses it.

Your answers

Nothing answered yet. There are 4 questions on this form.

Still to answer

4 answers are still to come.

Nothing is amiss in what you have written. The document is simply not finished, and the draft marks each gap where an answer will go.

  1. The Owner and the Contractor
  2. The change in the work
  3. Cost
  4. Time
  5. Signing

Step 1 of 5

The Owner and the Contractor

For example: Anmol Kaur

Owner's addressNeeded

For example: Décor Craft Interiors

Contractor's address or officeNeeded
Read the whole draft

Clearing empties every box on this form, and there is no way back to what was in them.

The live draft

The draft, as it stands

This is the document as far as you have reached, not the whole of it yet — the rest appears as you answer more questions. It is rewritten every time you change an answer.

A long blank line — __________ — stands wherever an answer has not been given. It is left that visible on purpose, so an unfinished document cannot be mistaken for a finished one.

No answer has been given, so every place a detail belongs is standing blank. The shape of the document is worth reading even now.

VARIATION ORDER AND EXTENSION OF TIME

BETWEEN

__________, resident of __________ ("the Owner");

AND

__________, of __________ ("the Contractor").

1. THE ORIGINAL CONTRACT

2. THE CHANGE IN THE WORK

2.4 The Contractor shall not begin the changed or additional work, and the Owner shall not be liable to pay for it, until this Variation Order has been signed by both Parties. Work omitted under this Order shall not be carried out.

3. COST

4. TIME

5. OTHER TERMS

5.1 Except as changed by this Variation Order, the Contract continues in full force, including its terms on retention, defect liability, insurance, safety and dispute resolution, which apply to the varied work as they apply to the rest.

5.2 No other change in the work, price or time is agreed unless it is recorded in writing and signed by both Parties.

OWNER

_________________
__________

CONTRACTOR

_________________
__________

WITNESSES

  1. 1. _________________
  1. 2. _________________

The rest stays out of view until every answer is in.

KAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINAL

Reading costs nothing. Keeping a copy needs an account.

The opening of the draft is on this page as you answer it. Once every answer is in, the button below opens the whole draft, watermarked — still without an account. Printing it, or keeping a clean copy, is where an account is asked for. That is the whole arrangement.

A kept copy has to belong to somebody, and that is the reason for the account. There is nothing further to it.

Continue to download

Carry on reading without one

Back to what this document is

We've updated our Terms

Please read the updated documents below and accept them once to keep taking documents away and buying kits. Browsing, filling in and previewing a document are not affected.