Kaagazaat

Fill in your details

Annual Maintenance Contract (Lift, DG, STP)

Answer what you can. The draft beside these boxes is rewritten as you go, so you can see exactly what each answer does to the document.

What you type stays in this browser. Moving to a new step asks this site to draw it, but nothing is kept anywhere until you choose to keep a copy — and closing this tab loses it.

Your answers

Nothing answered yet. There are 9 questions on this form.

Still to answer

8 answers are still to come.

Nothing is amiss in what you have written. The document is simply not finished, and the draft marks each gap where an answer will go.

  1. The Society and the contractor
  2. The equipment
  3. Service, fee and term

Step 1 of 3

The Society and the contractor

For example: Panchkula

For example: Green Park Residents Welfare Association

What is the Society's address?Needed

For example: Harjinder Singh

For example: President

For example: Kone Elevators Service

Contractor's addressNeeded
More details — you may leave these

A calendar date — the day, the month and the year. Dates in a document like this are read against one another, so a date typed here can change what another date is allowed to be.

Read the whole draft

Clearing empties every box on this form, and there is no way back to what was in them.

The live draft

The draft, as it stands

This is the document as far as you have reached, not the whole of it yet — the rest appears as you answer more questions. It is rewritten every time you change an answer.

A long blank line — __________ — stands wherever an answer has not been given. It is left that visible on purpose, so an unfinished document cannot be mistaken for a finished one.

No answer has been given, so every place a detail belongs is standing blank. The shape of the document is worth reading even now.

ANNUAL MAINTENANCE CONTRACT

This Contract is made on __________ at __________ between:

(1) __________, __________, acting through __________, __________ (the "Society"); and
(2) __________, __________ (the "Contractor").

  1. 6. Safety, licences and staff. The Contractor shall use only trained and competent persons, and shall follow the safety rules for this kind of equipment. The Society remains responsible for holding any licence, inspection certificate or consent that the law requires for the equipment itself, and the Contractor shall give the help and records needed for any inspection. The Contractor shall pay its staff and meet its duties as their employer.
  1. 7. Damage and liability. The Contractor shall make good any loss or damage to the Society, its residents or their property, or injury to any person, that results from the Contractor's negligence or from work done outside this Contract's terms.

Signed by the parties on the date written above.

For the Society
Signature: ______________________________
__________, __________

For the Contractor
Signature: ______________________________
__________

Witnesses

  1. 1. Name and signature: ______________________________
  2. 2. Name and signature: ______________________________

The rest stays out of view until every answer is in.

KAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINALKAAGAZAAT — PREVIEW, NOT FINAL

Reading costs nothing. Keeping a copy needs an account.

The opening of the draft is on this page as you answer it. Once every answer is in, the button below opens the whole draft, watermarked — still without an account. Printing it, or keeping a clean copy, is where an account is asked for. That is the whole arrangement.

A kept copy has to belong to somebody, and that is the reason for the account. There is nothing further to it.

Continue to download

Carry on reading without one

Back to what this document is

We've updated our Terms

Please read the updated documents below and accept them once to keep taking documents away and buying kits. Browsing, filling in and previewing a document are not affected.