This Contract is made at Mohali on 2 April 2026
BETWEEN
Ramandeep Singh, resident of House No. 214, Sector 70, Mohali ("the Owner", which expression shall include the Owner's heirs, legal representatives and assigns), of the ONE PART;
AND
Gurpreet Singh, Interio Kitchens, of SCO 44, Phase 3B2, Mohali, bearing registration/GST number 03ABCDE1234F1Z5 ("the Contractor", which expression shall include the Contractor's partners, legal representatives and permitted assigns), of the OTHER PART.
The Owner and the Contractor are together "the Parties".
1.1 The Contractor agrees to supply, deliver and install, and the Owner agrees to buy, the modular kitchen and wardrobes described below at House No. 214, Sector 70, Mohali ("the Site") ("the Work").
1.2 What is being supplied and installed: L-shaped modular kitchen with base and wall units, tall unit and breakfast counter; two sliding-door wardrobes in the master bedroom and children’s room
2.1 Materials, finishes, hardware and brands: Carcass: 18 mm moisture-resistant board; shutters: laminate with edge-banding; soft-close hinges and telescopic channels of a named brand; granite countertop
2.2 The Contractor shall not substitute any material, finish, hardware or brand named above without the Owner's prior written consent, and any substitute shall be of equal or better quality at no extra cost to the Owner.
2.3 The Owner may inspect the materials on delivery and before installation. Material that does not match the agreed description may be rejected, and the Contractor shall replace it promptly at its own cost.
3.1 The Contractor shall prepare the layout and working drawings after taking measurements at the Site, and the Owner shall approve them in writing before manufacture begins.
3.2 Once the Owner has approved the drawings in writing, any change asked for by the Owner shall be agreed in writing together with its effect on price and time.
3.3 Units are made to the measurements and drawings approved. If the Owner cancels after manufacture has begun, the Owner shall pay for the materials cut and the work done up to that date.
4.1 The Contractor shall deliver the materials to the Site by 1 April 2026 and complete installation by 2 April 2026, subject to force majeure and any delay directly caused by the Owner.
4.2 Rs 2,000 per week of delay beyond the completion date, capped at 5% of the contract value
4.3 Site readiness: Owner to complete tiling, plumbing and electrical points as per the approved drawing; Contractor to confirm in writing that the Site is ready before delivery
4.4 The Contractor shall carry out installation with competent workmen, protect existing floors, walls and fittings during the work, remove its debris and packing, and leave the Site clean on completion.