This Undertaking is given at Mohali on 2 April 2026
BY
Balwinder Singh, Sai Construction Co., of SCO 44, Phase 3B2, Mohali ("the Contractor", which expression shall include its partners, legal representatives and permitted assigns),
IN FAVOUR OF
Gurpreet Singh, resident of House No. 412, Sector 44-A, Chandigarh ("the Owner", which expression shall include the Owner's heirs and legal representatives).
1.1 The Contractor has been engaged by the Owner under House Construction Contract dated 4 January 2026 ("the Contract") to carry out the following work at Plot No. 118, Sector 70, Mohali ("the Site"): Construction of a double-storey house with basement
1.2 The Contractor expects to have about 15 to 20 workers on the Site.
2.1 The Contractor is solely responsible for the safety of every person it engages at the Site, whether directly or through a sub-contractor or thekedar, and of every visitor to the work area.
2.2 The Contractor shall provide and see that its workers use the following safety arrangements: Helmets and safety shoes for all workers; harness for work at height; scaffolding checked each morning; first-aid box on site; no children or visitors in the work area
2.3 The person in charge of safety at the Site is Mr Sukhdev Singh, site supervisor.
2.4 The Contractor shall stop any work that is unsafe, and shall not leave an open excavation, a shaft or an unguarded edge without protection.
3.1 The Contractor shall maintain a workmen’s compensation and third-party liability policy for the duration of the Work
3.2 The policies held at the date of this Undertaking are: Workmen’s compensation policy no. 12345 with ABC Insurance, valid to 31 March 2027; third-party liability policy no. 67890, cover Rs 10,00,000, valid to 31 March 2027
3.3 The Contractor confirms that the cover is valid until 1 April 2026 and shall renew it, and give the Owner a copy, before it lapses if the Work is still continuing. The Contractor shall pay every premium and shall not allow a policy to lapse during the Work.
4.1 If any worker or other person engaged by the Contractor is injured, falls ill because of the work, or dies at or in connection with the Site, the Contractor alone shall be responsible for their medical care, for any compensation, wages, dues or other sums payable under the law applicable to them, and for all related costs, whether or not insured.
4.2 The Contractor shall inform the Owner of any accident within 24 hours, and shall give the Owner copies of any report made to the police, the insurer or any authority.
4.3 The Contractor is also responsible for any damage to the property of the Owner, a neighbour or the public caused by its workers or the Work, and shall make it good at its own cost.