This Contract is made at Chandigarh on 2 April 2026
BETWEEN
Simran Gill, resident of House No. 302, Sector 9, Panchkula ("the Owner", which expression shall include the Owner's heirs, legal representatives and assigns), of the ONE PART;
AND
Safe Demolition Works, of Industrial Area Phase 1, Mohali, bearing registration/GST number X ("the Contractor", which expression shall include the Contractor's partners, legal representatives and permitted assigns), of the OTHER PART.
The Owner and the Contractor are together "the Parties".
1.1 The Owner is the owner/allottee in possession of the building at House No. 302, Sector 9, Panchkula ("the Site").
1.2 Description of the structure: Old two-storey brick-and-lime house of about 2,000 square feet built-up area, with a boundary wall on three sides
1.3 The Contractor agrees to demolish the structure to the extent below, and to clear the Site, on the terms of this Contract ("the Work"). Extent of the Work: Complete demolition down to plinth level, including the boundary wall on the front side; foundations to be left in place
1.4 The Contractor shall not demolish anything outside the extent of the Work. The Owner shall give the Contractor access to the Site from the start date.
2.1 The Owner has already obtained any permission needed from the concerned authority to demolish the structure.
2.2 Contractor to apply to the Municipal Corporation on the Owner’s behalf; fees reimbursed by the Owner against receipts
2.3 The Contractor shall not start the Work until the permission, where one is needed, has been obtained. The Work does not authorise any new construction on the Site; a new building needs its own sanctioned plan and contract.
2.4 The Owner shall have the electricity, water, gas and sewer connections to the structure disconnected before the Work starts.
3.1 The Contractor shall plan and carry out the Work so that no person is injured and no property is damaged. The Contractor shall barricade the Site, put up warning signs, keep the public and the Owner's occupants away from the work area, and control dust and falling material.
3.2 Before the Work starts, the Parties shall jointly record the condition of the neighbouring buildings and shared walls by dated photographs or video, and each Party shall keep a copy.
3.3 The Contractor shall take special care of the following, and shall brace, prop or protect them as the work needs: Shared wall on the east side with House No. 304; boundary wall on the west side with House No. 300
3.4 The Contractor is responsible for, and shall repair at its own cost or pay for, any damage the Work causes to a neighbouring building, shared wall, road, drain or service line, and shall keep the Owner indemnified against any claim by a neighbour or other third party arising from the Work. The Owner shall tell the neighbours of the date the Work will start.