At a glance

Price
₹99 · GST included
Stamp duty
No stamp duty: it creates no right in property, so it is not an instrument under section 2(14), Indian Stamp Act, 1899.
Registration
Not registrable: creates no right in property; section 17, Registration Act, 1908 doesn't apply.
Witnesses
Not required.

₹99

GST included

Launch period: downloads are free for now. The prices shown apply once payments open.

Guided questions, full draft on screen, download in Word.

See all prices

Also called

  • building demolition application
  • demolition permit request
  • permission to demolish structure

Whether you can fill this in here

You can fill this in here

You can fill this one in on this site, and read the whole draft on screen before you decide anything about it. It is a carefully drafted template; it is not advice about your own facts.

Fill this one in
Why you need it

When you need it

Before demolishing a building, get the authority's permission — Chandigarh Building Rules (Urban), 2017 expressly cover demolition; Punjab applies its own procedure. Address occupants, utility disconnection, party walls, road safety, hazardous materials and debris. This does not authorise a replacement building; redevelopment needs its own sanction.

See stamp duty, registration and witnesses

What follows is written for Punjab and Chandigarh. It states the position there rather than describing how it varies, so the amounts below are the ones that apply — worth confirming at the sub-registrar’s office, because rates change. If the property is anywhere else in India, none of this is yours.

Stamp duty

No stamp duty: it creates no right in property, so it is not an instrument under section 2(14), Indian Stamp Act, 1899. Print on plain paper; pay only the authority's fee. Any affidavit filed is stamped separately.

Registration

Not registrable: creates no right in property; section 17, Registration Act, 1908 doesn't apply.

Notarisation

Not required, unless the authority asks for an affidavit.

Witnesses

Not required. The owner's and the professional's signatures suffice.

Talk to a lawyer about this document₹3,539 including GST (₹2,999 + 18% GST), per documentRequest Stamp Paper

Sample preview — placeholder answers, not your data

DEMOLITION PERMISSION APPLICATION

Application date: 1 April 2026

Applicant: Aarav Sharma, Sector 21, Panchkula, capacity Owner/allottee. Phone: 98765 43210; email: aarav@example.com.

Property: Plot 118, Sector 66, SAS Nagar, Punjab (Residential plot/building), Plot 118, Sector 66; allotment AL-118., site area 836.13 sq m. Title/allotment: Conveyance deed no. 2345 dated 10 June 2022. Jurisdiction Punjab; authority GMADA / competent building authority.

  1. DEMOLITION

Scope: Entire building. Description: Existing two-storey RCC residence, approx. 620 sq m.. Area: 620 sq m.

  1. OCCUPANCY AND UTILITIES

Occupancy: Vacant. Planned vacation: 2 April 2026 Utilities: Electricity/water/gas disconnection arranged before demolition. References: Electricity disconnection ED-118; water closure WS-118.

  1. METHOD AND STRUCTURAL SAFETY

Method status: Engineer-prepared demolition sequence attached. Method/sequence: Top-down mechanical demolition with barricaded exclusion zone.. Adjacent-property risk: No common wall/critical adjacent structure identified. Protection: Full-height dust screen, vibration monitoring and temporary shoring..

Questions about this document

Does the Demolition Permission Application need stamp paper or stamp duty in Punjab and Chandigarh?

No stamp duty: it creates no right in property, so it is not an instrument under section 2(14), Indian Stamp Act, 1899. Print on plain paper; pay only the authority's fee. Any affidavit filed is stamped separately.

Does the Demolition Permission Application need registration in Punjab and Chandigarh?

Not registrable: creates no right in property; section 17, Registration Act, 1908 doesn't apply.

What does the Demolition Permission Application cost on Kaagazaat?

₹99, GST included.

Launch period: downloads are free for now. The prices shown apply once payments open.

Does the Demolition Permission Application need witnesses?

Not required. The owner's and the professional's signatures suffice.