Kaagazaat

Design-and-Build Office Fit-out Contract

At a glance

Price
Free, always.
Stamp duty
Chargeable as an agreement, not a conveyance.
Registration
Not compulsorily registrable under section 17 of the Registration Act, 1908 — no interest in immovable property is created.
Witnesses
Not legally required, but two witnesses are provided for below, given the value that typically passes under a contract of this kind and how often the facts of what was agreed are disputed once work has started.

Free

Free, always.

Free: up to 5 documents a day.

Guided questions, full draft on screen, download in Word.

See all prices

Also called

  • office fit-out contract
  • turnkey office interior contract
  • design and build agreement for office
  • office interior design and execution contract
  • daftar fit-out ka contract
  • ਦਫ਼ਤਰ ਫਿੱਟ-ਆਊਟ ਇਕਰਾਰਨਾਮਾ
  • workstation and partition contract
  • turnkey interior contractor agreement

When you need it

You are engaging one firm both to design and to build the fit-out of an office. The Contract sets out the brief, how the drawings are submitted and approved, the BOQ and price, the payment stages, the timeline and any delay penalty, and a handover with a written snag list that must be cleared before the final payment.

Read more

Not for interior work where you already have the design and only need execution — use the Interior Work Contract. Not for building a structure — use the House Construction Contract. Not for design only with no execution — use the Interior Designer Consultancy Agreement.

Whether you can fill this in here

You can fill this in here

You can fill this one in on this site, and read the whole draft on screen before you decide anything about it. It is a carefully drafted template; it is not advice about your own facts.

Fill this one in
See stamp duty, registration and witnesses

What follows is written for Punjab and Chandigarh. It states the position there rather than describing how it varies, so the amounts below are the ones that apply — worth confirming at the sub-registrar’s office, because rates change. If the property is anywhere else in India, none of this is yours.

Stamp duty

Chargeable as an agreement, not a conveyance. PUNJAB: Article 5, Schedule I-A to the Indian Stamp Act, 1899 as applicable in Punjab, residuary rate under Article 5(c). Confirm the current figure with the Sub-Registrar or against revenue.punjab.gov.in. CHANDIGARH: the equivalent agreement article under the Chandigarh Administration's table at revenue.chd.gov.in; confirm at the Sub-Registrar's office, 30 Bays Building.

Registration

Not compulsorily registrable under section 17 of the Registration Act, 1908 — no interest in immovable property is created.

Notarisation

Not legally required. Notarising is sometimes done to fix the date of signing, which can matter if the start date or timeline is later disputed.

Witnesses

Not legally required, but two witnesses are provided for below, given the value that typically passes under a contract of this kind and how often the facts of what was agreed are disputed once work has started.

Request Stamp Paper

Sample preview — placeholder answers, not your data

DESIGN-AND-BUILD OFFICE FIT-OUT CONTRACT

This Contract is made at Chandigarh on 2 April 2026

BETWEEN

Simran Gill / Gill Advisory Pvt Ltd, of SCO 45, Sector 17, Chandigarh, acting through Simran Gill, Director ("the Client", which expression shall include the Client's successors, legal representatives and permitted assigns), of the ONE PART;

AND

Prime Fitouts, of Industrial Area Phase 2, Chandigarh, bearing registration/GST number X ("the Contractor", which expression shall include the Contractor's partners, legal representatives and permitted assigns), of the OTHER PART.

The Client and the Contractor are together "the Parties".

1. THE PREMISES AND THE WORK

1.1 The Client is the owner or lawful occupier of the office premises at Office 304, Third Floor, Sector 8, Mohali, of approximately 2,400 square feet ("the Premises").

1.2 The Contractor agrees to design and build the fit-out of the Premises on a single-point-responsibility basis, being both the design and the execution, in accordance with the brief and scope below and the drawings approved under clause 2 ("the Work").

1.3 Brief and scope: Open-plan workstations for 30 seats, two cabins, a meeting room, a reception, false ceiling, flooring, lighting, electrical and data cabling, and a pantry

1.4 The Contractor supplies all materials

Specifically: Client supplies air-conditioners and furniture; Contractor supplies everything else

1.5 All materials shall conform to the specifications agreed in the approved drawings and material schedule. The Client or the Client's representative may inspect materials and workmanship at any reasonable time before they are fixed or concealed.

2. DESIGN AND APPROVAL OF DRAWINGS

2.1 Before starting work, the Contractor shall prepare and submit to the Client the layout plan, the ceiling, electrical and flooring drawings, and a material schedule for the Work.

2.2 The Client shall approve the drawings in writing, or send written comments, within 7 days of receiving them. The Contractor shall revise the drawings to meet reasonable comments and resubmit them, and the same period applies to each resubmission.

2.3 The Contractor shall not begin any part of the Work that depends on a drawing until the Client has approved that drawing in writing. Drawings approved in writing form part of this Contract.

2.4 The Contractor shall prepare the design with the reasonable skill and care expected of a professional fit-out firm and so that the finished Work is fit for the use stated in the brief. The Client's approval of a drawing does not relieve the Contractor of responsibility for an error in it.

3. PRICE, BOQ AND PAYMENT

3.1 This Contract is priced on a fixed lump-sum price for the whole work. The Contractor shall give the Client a BOQ with quantities and rates for the Work, which, once the Client signs it, forms part of this Contract.

Questions about this document

Does the Design-and-Build Office Fit-out Contract need stamp paper or stamp duty in Punjab and Chandigarh?

Chargeable as an agreement, not a conveyance.

See the full position on stamp duty, registration and witnesses
Does the Design-and-Build Office Fit-out Contract need registration in Punjab and Chandigarh?

Not compulsorily registrable under section 17 of the Registration Act, 1908 — no interest in immovable property is created.

See the full position on stamp duty, registration and witnesses
What does the Design-and-Build Office Fit-out Contract cost on Kaagazaat?

Free, always.

Does the Design-and-Build Office Fit-out Contract need witnesses?

Not legally required, but two witnesses are provided for below, given the value that typically passes under a contract of this kind and how often the facts of what was agreed are disputed once work has started.

See the full position on stamp duty, registration and witnesses

Often needed with this document

Back to House Construction & Renovation

We've updated our Terms

Please read the updated documents below and accept them once to keep taking documents away and buying kits. Browsing, filling in and previewing a document are not affected.

Design-and-Build Office Fit-out Contract | Kaagazaat